AstraRadinternal

Auto-schedule - Design Picker

Three modules, three variants each. Pick one per module. They combine, so A2 + B1 + C2 is a valid answer.
Mockup - Select - Plan - Build

Placing five waiting deliveries without dragging five cards

What it is: one control in the admin content calendar that takes the deliveries waiting in the review inbox and puts them on the next open publish days, under a spacing strategy you choose. It is a planner, not a promoter. Clicking it stages placements into the pending changes tray that already exists; nothing touches disk until Apply, and the same gates that guard the build guard the tray.

The real morning this is for

It is Saturday 29 August 2026. Double reading radiology: a procurement guide for buyers arrived this morning, the fifth delivery sitting in the review inbox. The other four have been waiting since the 25th, 26th, 27th and 28th.

The Mon/Wed/Fri backbone is booked solid from Monday 31 August to 20 September 2027, so there is no gap to fall into. The open days are the Tuesdays and Thursdays: 111 of them before the last booked day, 55 Tuesdays, 55 Thursdays and one Wednesday. September alone reads 13 scheduled and 9 open slots.

To place five deliveries today you promote each one, then drag each card onto a dashed day, then check the tray. Five times. Auto-schedule does the arithmetic part in one click and leaves the judgement part, which day, which order, how far apart, in your hands as three controls.

What is honest about the screens below

All five deliveries currently pass the gates: zero errors each, with warnings only. The vendor delivery normalizer landed earlier today, which is why. The all red triage state in Module C is not what you would see this morning. It is built because it stays reachable: one edit in the review inbox editor nulls the gate verdict, since the verdict is keyed to the file content, and until the gates are re-run nothing in the inbox is known to pass. The triage screens quote the last recorded gate lines verbatim rather than inventing failures.

Four things auto-schedule never does, in any variant here. It never moves an article that already has a date in order to make room, which is cascade insert and is deliberately deferred. It never touches a live article's date, because that is published history. It never places on a weekend or on 25 December or 1 January. And it never places on today or on a day already past.

Two inbox rows are excluded from the count of five and are named wherever the button is disabled: blg-770826-hipaa-vs-hitrust is already promoted and live at resources/hipaa-vs-hitrust, and blg-10-test-article-for-webhook-integration is a retired fixture, a 108 KB webhook test moved to seo/blg-inbox/retired/ after being queued on 2026-08-24.

Module A

Where the affordance lives, and what it says

The control goes in the calendar header row, after the counters the component already renders at line 113. Baseline label: Auto-schedule 5 waiting. Every variant also has to answer the empty case, because zero waiting is a real state most days of the year: the disabled control says why, and names the two inbox rows that are excluded so nobody goes looking for a delivery that was never eligible.

astrarad.com/admin/content?view=calendar
Five waiting, the button sits after the counters
13 scheduled · 9 open slots
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Open Tue slotpromote or move an article here
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slotpromote or move an article here
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slotpromote or move an article here
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slotpromote or move an article here
11
Site neutral imaging payment 2027: what to model now
resources
12
13
Nothing waiting, the morning after those five were applied
18 scheduled · 4 open slots

Nothing waiting. The 2 inbox rows left are both excluded: hipaa-vs-hitrust is already promoted and live at resources/hipaa-vs-hitrust, and blg-10-test-article-for-webhook-integration is a retired fixture, moved to seo/blg-inbox/retired/ on 2026-08-24.

Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Privileging vs credentialing: what actually separates them
resourcesplaced
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
HL7 vs FHIR: a coexistence guide for healthcare IT teams
resourcesplaced
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Radiation dose monitoring: a practical program guide
resourcesplaced
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
RADPEER scoring: six step QA checklist for radiology teams
resourcesplaced
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Double reading radiology: a procurement guide for buyers
resourcesplaced
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slotpromote or move an article here
18
Teleradiology contract terms: what to negotiate
resources
19
20
Variant A1

Inline primary

A filled primary button between the counters and the view toggle.

What you are looking at

The button carries its own count, so the header sentence reads "13 scheduled, 9 open slots, auto-schedule 5 waiting" left to right without a legend.

Disabled, it drops the count and says why underneath. The reason names both excluded rows so nobody hunts for a fifth delivery that was never eligible.

Why it might win

  • Impossible to miss on the first visit, which matters for a control nobody has used before.
  • One control, one label, no state where the affordance is ambiguous.

The tradeoff

  • A filled primary in the header competes with Apply in the rail, and Apply is the button that actually writes.
  • It is loud on every month you open, including the eleven months where nothing is waiting and it is dead weight.
astrarad.com/admin/content?view=calendar
Five waiting, the quiet button lights up
13 scheduled · 9 open slots
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Open Tue slotpromote or move an article here
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slotpromote or move an article here
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slotpromote or move an article here
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slotpromote or move an article here
11
Site neutral imaging payment 2027: what to model now
resources
12
13
Nothing waiting, the same control goes flat and dead
18 scheduled · 4 open slots

Nothing waiting. The 2 inbox rows left are both excluded: hipaa-vs-hitrust is already promoted and live at resources/hipaa-vs-hitrust, and blg-10-test-article-for-webhook-integration is a retired fixture, moved to seo/blg-inbox/retired/ on 2026-08-24.

Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Privileging vs credentialing: what actually separates them
resourcesplaced
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
HL7 vs FHIR: a coexistence guide for healthcare IT teams
resourcesplaced
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Radiation dose monitoring: a practical program guide
resourcesplaced
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
RADPEER scoring: six step QA checklist for radiology teams
resourcesplaced
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Double reading radiology: a procurement guide for buyers
resourcesplaced
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slotpromote or move an article here
18
Teleradiology contract terms: what to negotiate
resources
19
20
Variant A2

Quiet until waiting

A secondary button that only takes primary weight when the inbox is not empty.

What you are looking at

With five waiting it borrows the primary tint and a count pill. With nothing waiting it is a flat, disabled secondary that says nothing until you read the line beneath it.

The count is a pill rather than words, so the control keeps one width as the number changes.

Why it might win

  • The header is loud exactly when there is work and silent otherwise, which is most of the year.
  • Never competes with Apply, because Apply only exists once a plan is staged and by then the header button has done its job.

The tradeoff

  • Quieter means less discoverable. Somebody who has never used auto-schedule may not see it on the first pass.
  • Two visual weights for one control is a rule the rest of the admin panel does not use anywhere else.
astrarad.com/admin/content?view=calendar
Five waiting, the count is the third statistic and the third statistic is the button
 
Scheduled13
Open slots9
Waiting5Auto-schedule →
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Open Tue slotpromote or move an article here
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slotpromote or move an article here
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slotpromote or move an article here
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slotpromote or move an article here
11
Site neutral imaging payment 2027: what to model now
resources
12
13
Nothing waiting, the statistic reads zero and stops being a button
 
Scheduled18
Open slots4
Waiting0

Nothing waiting. The 2 inbox rows left are both excluded: hipaa-vs-hitrust is already promoted and live at resources/hipaa-vs-hitrust, and blg-10-test-article-for-webhook-integration is a retired fixture, moved to seo/blg-inbox/retired/ on 2026-08-24.

Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Privileging vs credentialing: what actually separates them
resourcesplaced
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
HL7 vs FHIR: a coexistence guide for healthcare IT teams
resourcesplaced
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Radiation dose monitoring: a practical program guide
resourcesplaced
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
RADPEER scoring: six step QA checklist for radiology teams
resourcesplaced
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Double reading radiology: a procurement guide for buyers
resourcesplaced
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slotpromote or move an article here
18
Teleradiology contract terms: what to negotiate
resources
19
20
Variant A3

Counter as affordance

Scheduled, open slots and waiting rendered as three statistics; the third one is clickable.

What you are looking at

The existing "13 scheduled, 9 open slots" text becomes a three cell statistic strip and the waiting count joins it. The waiting cell is tinted and carries an arrow, which is the whole affordance.

At zero it greys out in place. The strip never changes width, so the header does not reflow between the two states.

Why it might win

  • The number and the action are the same object, so there is no way to see 5 waiting and not see how to place them.
  • It replaces a plain text counter with something that answers "and what do I do about it".

The tradeoff

  • A statistic that is also a button is a pattern that has to be learned; two of the three cells do nothing when clicked.
  • It rewrites the header row the calendar already ships, so this is the only Module A variant that is not additive.

Recommended: A2, quiet until waiting

Eleven months of the year the inbox is empty and a filled primary in the header is noise competing with Apply, the button that actually writes. A2 is loud on exactly the days there is something to place and flat on the rest, and it is additive: it does not rewrite the counter line the calendar already ships, which A3 does.

Against it: A2 is the least discoverable on a first visit. If that worries you more than the noise, take A1.

Module B

The planner panel, and how the options read

Clicking turns the 280px right rail from Pending moves into a plan view. It has to expose five things: Spacing (next open slots by default, one a week, one a fortnight), Start from (a date, default tomorrow, 2026-08-30), Order (oldest delivery first by default, newest first, as listed), a Only deliveries that pass the gates checkbox that is on by default, and a per row section select defaulted to resources. Each variant shows the default plan and then a second state with the strategy changed, so the date differences are visible rather than described.

astrarad.com/admin/content?view=calendar
Default: next open slots, oldest delivery first
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
planned 2 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
planned 3 of 5Radiation dose monitoring: a practical program guide
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
planned 4 of 5RADPEER scoring: six step QA checklist for radiology teams
resources
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 5 of 5Double reading radiology: a procurement guide for buyers
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20

Auto-schedule 5 waiting

Places waiting deliveries on open days. Nothing is written; each placement lands in the pending tray.

Spacing
Start fromOrder

Plan, 5 placements
Privileging vs credentialing: what actually separates them
/resources/privileging-vs-credentialing
1Tue Sep 1
HL7 vs FHIR: a coexistence guide for healthcare IT teams
/resources/hl7-vs-fhir
2Thu Sep 3
Radiation dose monitoring: a practical program guide
/resources/radiation-dose-monitoring
3Tue Sep 8
RADPEER scoring: six step QA checklist for radiology teams
/resources/radpeer-scoring
4Thu Sep 10
Double reading radiology: a procurement guide for buyers
/resources/double-reading-radiology
5Tue Sep 15

Staging puts these 5 into the pending tray next to any move you dragged. Nothing on disk changes until Apply, and Check runs the same gates the build runs.

Same panel, spacing changed to one a fortnight
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slot
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slot
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slot
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 2 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20

Auto-schedule 5 waiting

Same five deliveries, one a fortnight. The last two land in October, off this month entirely, which is why the plan list and not the grid is the source of truth.

Spacing
Start fromOrder

Plan, 5 placements
Privileging vs credentialing: what actually separates them
/resources/privileging-vs-credentialing
1Tue Sep 1
HL7 vs FHIR: a coexistence guide for healthcare IT teams
/resources/hl7-vs-fhir
2Tue Sep 15
Radiation dose monitoring: a practical program guide
/resources/radiation-dose-monitoring
3Tue Sep 29
RADPEER scoring: six step QA checklist for radiology teams
/resources/radpeer-scoring
4Tue Oct 13
Double reading radiology: a procurement guide for buyers
/resources/double-reading-radiology
5Tue Oct 27

26 open days in the next 90 days, to 2026-11-27: 13 of them are weekly slots and 7 are fortnightly. Beyond that the Mon/Wed/Fri backbone is booked solid to 2027-09-20.

Variant B1

Stacked planner

Every option stacked full width in the 280px rail the component already ships.

What you are looking at

Spacing is three stacked buttons, each showing the dates it would produce, so the choice is made by reading outcomes rather than guessing at a label.

Start from defaults to tomorrow, 2026-08-30. That is a Sunday, so the first placement is Tue Sep 1 whatever you do; the field exists for the case where you want to skip a week.

Every plan row carries its own section select, defaulted to resources because all five deliveries target resources slugs.

Why it might win

  • Fits 280px exactly, so the shipped grid split at component line 124 does not change.
  • The spacing hints mean the dates are visible before you commit to a strategy, not after.
  • One scroll gets you from strategy to the five dates to Stage, with no expanding or hiding.

The tradeoff

  • Tall. With five rows and their section selects the rail runs past the fold on a 900px viewport, so Stage needs a scroll.
  • The dates in the spacing hints have to be recomputed as you change Start from, or they go stale and lie.
astrarad.com/admin/content?view=calendar
Default: next open slots, plan as a compact list, one row expanded for its section select
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
planned 2 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
planned 3 of 5Radiation dose monitoring: a practical program guide
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
planned 4 of 5RADPEER scoring: six step QA checklist for radiology teams
resources
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 5 of 5Double reading radiology: a procurement guide for buyers
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20

Auto-schedule 5 waiting

Options collapse to two rows so the whole plan is visible without scrolling the rail.

Spacing
Start fromOrder

Plan, 5 placements
1Tue Sep 1Privileging vs credentialing: what actually separates them
2Thu Sep 3HL7 vs FHIR: a coexistence guide for healthcare IT teams
3Tue Sep 8Radiation dose monitoring: a practical program guide
4Thu Sep 10RADPEER scoring: six step QA checklist for radiology teams
5Tue Sep 15Double reading radiology: a procurement guide for buyers
Row 3, expanded
Radiation dose monitoring: a practical program guide
/resources/radiation-dose-monitoring
3Tue Sep 8

Staging puts these 5 into the pending tray next to any move you dragged. Nothing on disk changes until Apply, and Check runs the same gates the build runs.

Same panel, spacing changed to one a week
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slot
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
planned 2 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slot
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 3 of 5Radiation dose monitoring: a practical program guide
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
planned 4 of 5RADPEER scoring: six step QA checklist for radiology teams
resources
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
planned 5 of 5Double reading radiology: a procurement guide for buyers
resources
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4

Auto-schedule 5 waiting

Spacing changed to one a week. Every placement is a Tuesday, and the Thursdays stay open for news pegged pieces.

Spacing
Start fromOrder

Plan, 5 placements
1Tue Sep 1Privileging vs credentialing: what actually separates them
2Tue Sep 8HL7 vs FHIR: a coexistence guide for healthcare IT teams
3Tue Sep 15Radiation dose monitoring: a practical program guide
4Tue Sep 22RADPEER scoring: six step QA checklist for radiology teams
5Tue Sep 29Double reading radiology: a procurement guide for buyers

26 open days in the next 90 days, to 2026-11-27: 13 of them are weekly slots and 7 are fortnightly. Beyond that the Mon/Wed/Fri backbone is booked solid to 2027-09-20.

Variant B2

Segmented compact

Options as two segmented rows, plan as a one line per placement list.

What you are looking at

Spacing and Order become segmented controls, which costs two lines instead of eight and puts all five dates above the fold.

The plan list shows ordinal, date and title. A row expands in place when you need the per row section select, shown here on row 3.

Why it might win

  • The entire panel, options and plan and actions, fits without scrolling.
  • Reads like a schedule rather than a form, which is what it is.

The tradeoff

  • Three segments in 280px means the labels have to shorten to Next open, One a week, One a fortnight, and the dates each produces are no longer visible.
  • The per row section select is one click away rather than present, so the default of resources is more likely to go unexamined.
  • Truncated titles: "Radiation dose monitoring: a practical program guide" does not fit one line at 280px.
astrarad.com/admin/content?view=calendar
Default: next open slots, oldest first, rows carry the delivery numbers
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
planned 2 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
planned 3 of 5Radiation dose monitoring: a practical program guide
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
planned 4 of 5RADPEER scoring: six step QA checklist for radiology teams
resources
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 5 of 5Double reading radiology: a procurement guide for buyers
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20

Auto-schedule 5 waiting

340px wide. Each row carries the numbers that decide whether a delivery should go out at all: length, images, arrival, and how many warnings its last gate run raised.

Spacing
Start fromOrder

Plan, 5 placements
Privileging vs credentialing: what actually separates them
/resources/privileging-vs-credentialing
1Tue Sep 1
2379 words·1 image·arrived 2026-08-252 warnings, 0 errors
HL7 vs FHIR: a coexistence guide for healthcare IT teams
/resources/hl7-vs-fhir
2Thu Sep 3
3579 words·3 images·arrived 2026-08-263 warnings, 0 errors
Radiation dose monitoring: a practical program guide
/resources/radiation-dose-monitoring
3Tue Sep 8
4043 words·2 images·arrived 2026-08-273 warnings, 0 errors
RADPEER scoring: six step QA checklist for radiology teams
/resources/radpeer-scoring
4Thu Sep 10
1810 words·3 images·arrived 2026-08-283 warnings, 0 errors
Double reading radiology: a procurement guide for buyers
/resources/double-reading-radiology
5Tue Sep 15
3107 words·4 images·arrived 2026-08-292 warnings, 0 errors

Staging puts these 5 into the pending tray next to any move you dragged. Nothing on disk changes until Apply, and Check runs the same gates the build runs.

One a week, newest delivery first, so the order genuinely reverses
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Double reading radiology: a procurement guide for buyers
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slot
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
planned 2 of 5RADPEER scoring: six step QA checklist for radiology teams
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slot
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 3 of 5Radiation dose monitoring: a practical program guide
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
planned 4 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
planned 5 of 5Privileging vs credentialing: what actually separates them
resources
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4

Auto-schedule 5 waiting

One a week, newest delivery first. Double reading arrived this morning and goes out first; privileging arrived on the 25th and goes out last.

Spacing
Start fromOrder

Plan, 5 placements
Double reading radiology: a procurement guide for buyers
/resources/double-reading-radiology
1Tue Sep 1
3107 words·4 images·arrived 2026-08-292 warnings, 0 errors
RADPEER scoring: six step QA checklist for radiology teams
/resources/radpeer-scoring
2Tue Sep 8
1810 words·3 images·arrived 2026-08-283 warnings, 0 errors
Radiation dose monitoring: a practical program guide
/resources/radiation-dose-monitoring
3Tue Sep 15
4043 words·2 images·arrived 2026-08-273 warnings, 0 errors
HL7 vs FHIR: a coexistence guide for healthcare IT teams
/resources/hl7-vs-fhir
4Tue Sep 22
3579 words·3 images·arrived 2026-08-263 warnings, 0 errors
Privileging vs credentialing: what actually separates them
/resources/privileging-vs-credentialing
5Tue Sep 29
2379 words·1 image·arrived 2026-08-252 warnings, 0 errors

26 open days in the next 90 days, to 2026-11-27: 13 of them are weekly slots and 7 are fortnightly. Beyond that the Mon/Wed/Fri backbone is booked solid to 2027-09-20.

Variant B3

Wide planner drawer

The rail widens from 280px to 340px while a plan is being built.

What you are looking at

Same options as B1, but each plan row also shows words, images, arrival date and the warning count from the last gate run. Radiation dose monitoring is 4043 words against a 2000 to 3900 band, and that is the kind of thing you want to see before you put it on a Tuesday.

The second state changes two things at once, spacing to one a week and order to newest first, so Double reading radiology, which arrived this morning, leads.

Why it might win

  • The only variant where the decision to place and the decision to hold back can be made from the same screen.
  • At 340px the titles fit on two lines without truncation.

The tradeoff

  • It needs 340px, not the 280px the component ships. The grid loses 60px, which at a 1280px viewport is roughly nine pixels off each day column.
  • A rail that changes width when you press a button is a layout shift, and the month reflows under you at the moment you are reading it.
  • More numbers per row is more to read for a task that is mostly about dates.

Recommended: B1, stacked planner

B1 is the only variant that fits the 280px rail the component ships at line 124 while still showing, before you choose, what each spacing strategy would actually produce. B3 needs 340px, which shrinks the month by about nine pixels per day column at a 1280px viewport and reflows the grid at the moment you are reading it.

Against it: B1 is tall, so Stage sits below the fold on a 900px viewport. Worth taking B2 only if you expect to run this weekly and want the whole panel on one screen, at the cost of losing the date hints.

Module C

A planned placement on the grid, and the day nothing can be planned

Two things this module has to settle. First, how a staged placement renders on the dashed open days of the real September 2026 grid: visibly different from the amber pending move that already exists, individually undoable, individually draggable. Second, the all red state, where the plan comes back empty and the panel becomes a per delivery triage list quoting the recorded gate lines with a way into the review inbox editor. The grids below are September exactly as it is on disk: Mon/Wed/Fri booked, Tue/Thu open, weekends sunken and inert.

astrarad.com/admin/content?view=calendar
Five placements staged on the open Tue/Thu days, one amber move dragged on top
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
planned 1 of 5Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
planned 2 of 5HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
planned 3 of 5Radiation dose monitoring: a practical program guide
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
planned 4 of 5RADPEER scoring: six step QA checklist for radiology teams
resources
11
vacated · was Site neutral imaging
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
planned 5 of 5Double reading radiology: a procurement guide for buyers
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Site neutral imaging payment 2027: what to model now
resourceswas Fri Sep 11
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
Open Tue slot
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
Open Tue slot
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4
Scheduled, on diskOpen Tue/Thu slotPlanned by auto-schedule, staged onlyPending move you dragged

Auto-schedule 5 staged

5 placements and 1 move you dragged, in one tray. Apply lands them as a single commit; nothing on disk has changed yet.

Planned placements
1Tue Sep 1Privileging vs credentialing: what actually separates them
2Thu Sep 3HL7 vs FHIR: a coexistence guide for healthcare IT teams
3Tue Sep 8Radiation dose monitoring: a practical program guide
4Thu Sep 10RADPEER scoring: six step QA checklist for radiology teams
5Tue Sep 15Double reading radiology: a procurement guide for buyers
Move you dragged
Site neutral imaging payment 2027: what to model now
/resources/site-neutral-imaging-payment-2027
Fri Sep 11Thu Sep 17

Auto-schedule never moves an article that already has a date to make room. Site neutral moved because you dragged it, after the plan was staged.

All red: no delivery has a passing verdict, so the panel becomes triage
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Open Tue slot
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slot
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slot
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slot
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Open Tue slot
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
Open Tue slot
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
Open Tue slot
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4
Scheduled, on diskOpen Tue/Thu slotPlanned by auto-schedule, staged onlyPending move you dragged

Auto-schedule 5 waiting

Spacing, start date and order are still set. There is simply nothing eligible to place them on.

Nothing to plan

0 of 5 deliveries have a passing gate verdict, so there is no plan to stage. Auto-schedule places dates, it does not fix files.

Privileging vs credentialing: what actually separates them
blg-770825-privileging-vs-credentialing

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 20 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 1 more from the same run

HL7 vs FHIR: a coexistence guide for healthcare IT teams
blg-775938-hl7-vs-fhir

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn only 1 internal link(s); the convention is 3 to 12.

and 2 more from the same run

Radiation dose monitoring: a practical program guide
blg-771315-radiation-dose-monitoring

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 27 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 2 more from the same run

RADPEER scoring: six step QA checklist for radiology teams
blg-775648-radpeer-scoring

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 10 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 2 more from the same run

Double reading radiology: a procurement guide for buyers
blg-779314-double-reading-radiology

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 9 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 1 more from the same run

Unticking Only deliveries that pass the gates would stage all 5 onto Sep 1, Sep 3, Sep 8, Sep 10 and Sep 15 anyway. Apply would then be refused by the same gates and the tray would sit there unlandable, so the box stays ticked by default.

Variant C1

Dashed slot, filled in

A planned card keeps the dashed edge of the open slot it landed on.

What you are looking at

The dashed border says the same thing it said when the day was empty: this is not on disk. It is now tinted and holds a title, so the day reads as spoken for without reading as scheduled.

Sep 17 carries the amber card, which is the existing pending move treatment, and Sep 11 shows the vacated marker it left behind. Blue dashed is planned, amber solid is a move you made.

Every card has its own undo, and every card is draggable: dragging a planned card to another open day rewrites that one placement and leaves the other four alone.

Why it might win

  • Continuous with what the day looked like a second earlier, so nothing jumps.
  • The dashed edge is already the codebase vocabulary for "not real yet".

The tradeoff

  • A dashed border also means "open slot", so at a glance a planned day and an empty day share an outline.
  • Nothing on the card says where it sits in the plan, so reordering has no visible handle.
astrarad.com/admin/content?view=calendar
Five placements staged, each numbered with its position in the plan
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
1
Privileging vs credentialing: what actually separates them
resources
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
2
HL7 vs FHIR: a coexistence guide for healthcare IT teams
resources
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
3
Radiation dose monitoring: a practical program guide
resources
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
4
RADPEER scoring: six step QA checklist for radiology teams
resources
11
vacated · was Site neutral imaging
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
5
Double reading radiology: a procurement guide for buyers
resources
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Site neutral imaging payment 2027: what to model now
resourceswas Fri Sep 11
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
Open Tue slot
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
Open Tue slot
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4
Scheduled, on diskOpen Tue/Thu slotPlanned by auto-schedule, staged onlyPending move you dragged

Auto-schedule 5 staged

5 placements and 1 move you dragged, in one tray. Apply lands them as a single commit; nothing on disk has changed yet.

Planned placements
1Tue Sep 1Privileging vs credentialing: what actually separates them
2Thu Sep 3HL7 vs FHIR: a coexistence guide for healthcare IT teams
3Tue Sep 8Radiation dose monitoring: a practical program guide
4Thu Sep 10RADPEER scoring: six step QA checklist for radiology teams
5Tue Sep 15Double reading radiology: a procurement guide for buyers
Move you dragged
Site neutral imaging payment 2027: what to model now
/resources/site-neutral-imaging-payment-2027
Fri Sep 11Thu Sep 17

Auto-schedule never moves an article that already has a date to make room. Site neutral moved because you dragged it, after the plan was staged.

All red: no delivery has a passing verdict, so the panel becomes triage
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Open Tue slot
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slot
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slot
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slot
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Open Tue slot
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
Open Tue slot
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
Open Tue slot
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4
Scheduled, on diskOpen Tue/Thu slotPlanned by auto-schedule, staged onlyPending move you dragged

Auto-schedule 5 waiting

Spacing, start date and order are still set. There is simply nothing eligible to place them on.

Nothing to plan

0 of 5 deliveries have a passing gate verdict, so there is no plan to stage. Auto-schedule places dates, it does not fix files.

Privileging vs credentialing: what actually separates them
blg-770825-privileging-vs-credentialing

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 20 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

warn 0 FAQ entries; the convention is 5 to 7.

HL7 vs FHIR: a coexistence guide for healthcare IT teams
blg-775938-hl7-vs-fhir

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn only 1 internal link(s); the convention is 3 to 12.

warn 12 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

warn 0 FAQ entries; the convention is 5 to 7.

Radiation dose monitoring: a practical program guide
blg-771315-radiation-dose-monitoring

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 27 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

warn 4042 words; the resources band is 2000 to 3900.

warn 0 FAQ entries; the convention is 5 to 7.

RADPEER scoring: six step QA checklist for radiology teams
blg-775648-radpeer-scoring

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 10 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

warn 1809 words; the resources band is 2000 to 3900.

warn 0 FAQ entries; the convention is 5 to 7.

Double reading radiology: a procurement guide for buyers
blg-779314-double-reading-radiology

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 9 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

warn 0 FAQ entries; the convention is 5 to 7.

Unticking Only deliveries that pass the gates would stage all 5 onto Sep 1, Sep 3, Sep 8, Sep 10 and Sep 15 anyway. Apply would then be refused by the same gates and the tray would sit there unlandable, so the box stays ticked by default.

Variant C2

Numbered placement card

Solid primary edge, an ordinal badge and a grip.

What you are looking at

The badge is the one fact a planned card carries that a pending move never does: its position in a plan of five. Drag a card and the numbers renumber.

Solid blue against amber is unambiguous at a glance across a full month, which is the state that actually has to be readable.

The grip in the top right says draggable without a hover, which matters because these cards appear five at a time.

Why it might win

  • Distinct from both the open slot and the amber move at any zoom.
  • Makes reorder a visible, direct manipulation rather than a hidden option in the rail.

The tradeoff

  • A solid border reads as committed, and nothing here is committed until Apply. The tint has to carry all of the "not yet" meaning.
  • The badge and the grip cost a line of vertical space in a 112px cell that already holds a title and a section chip.
astrarad.com/admin/content?view=calendar
Five placements staged, marked by a left accent bar rather than a fill
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Privileging vs credentialing: what actually separates them
resourcesplanned 1 of 5
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
HL7 vs FHIR: a coexistence guide for healthcare IT teams
resourcesplanned 2 of 5
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Radiation dose monitoring: a practical program guide
resourcesplanned 3 of 5
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
RADPEER scoring: six step QA checklist for radiology teams
resourcesplanned 4 of 5
11
vacated · was Site neutral imaging
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Double reading radiology: a procurement guide for buyers
resourcesplanned 5 of 5
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Site neutral imaging payment 2027: what to model now
resourceswas Fri Sep 11
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
Open Tue slot
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
Open Tue slot
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4
Scheduled, on diskOpen Tue/Thu slotPlanned by auto-schedule, staged onlyPending move you dragged

Auto-schedule 5 staged

5 placements and 1 move you dragged, in one tray. Apply lands them as a single commit; nothing on disk has changed yet.

Planned placements
1Tue Sep 1Privileging vs credentialing: what actually separates them
2Thu Sep 3HL7 vs FHIR: a coexistence guide for healthcare IT teams
3Tue Sep 8Radiation dose monitoring: a practical program guide
4Thu Sep 10RADPEER scoring: six step QA checklist for radiology teams
5Tue Sep 15Double reading radiology: a procurement guide for buyers
Move you dragged
Site neutral imaging payment 2027: what to model now
/resources/site-neutral-imaging-payment-2027
Fri Sep 11Thu Sep 17

Auto-schedule never moves an article that already has a date to make room. Site neutral moved because you dragged it, after the plan was staged.

All red: no delivery has a passing verdict, so the panel becomes triage
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Aug 31
Dallas Fort Worth teleradiology: 53 trauma facilities
locations
1
Open Tue slot
2
Denver teleradiology: coverage by Colorado trauma level
locations
3
Open Thu slot
4
Hidden fees in teleradiology contracts: 14 line items
resources
5
6
7
Teleradiology in Connecticut | CT-licensed final reads
licensing
8
Open Tue slot
9
Teleradiology in Delaware: DE-licensed final reads
licensing
10
Open Thu slot
11
Site neutral imaging payment 2027: what to model now
resources
12
13
14
Houston teleradiology coverage for trauma service area Q
locations
15
Open Tue slot
16
Jacksonville teleradiology: trauma-grade night coverage
locations
17
Open Thu slot
18
Teleradiology contract terms: what to negotiate
resources
19
20
21
Teleradiology services in Georgia: GA-licensed reads
licensing
22
Open Tue slot
23
Teleradiology in Hawaii: HI-licensed final reads
licensing
24
Open Thu slot
25
The hidden cost of the prelim-plus-overread model
resources
26
27
28
2027 Medicare fee schedule: the radiology numbers explained
resources
29
Open Tue slot
30
Spine MRI teleradiology read level by level
services
Oct 1
Open Thu slot
Oct 2
Audit teleradiology report quality: a 12-point scorecard
resources
Oct 3
Oct 4
Scheduled, on diskOpen Tue/Thu slotPlanned by auto-schedule, staged onlyPending move you dragged

Auto-schedule 5 waiting

Spacing, start date and order are still set. There is simply nothing eligible to place them on.

Nothing to plan

0 of 5 deliveries have a passing gate verdict, so there is no plan to stage. Auto-schedule places dates, it does not fix files.

Privileging vs credentialing: what actually separates them
blg-770825-privileging-vs-credentialing

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 20 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 1 more from the same run

HL7 vs FHIR: a coexistence guide for healthcare IT teams
blg-775938-hl7-vs-fhir

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn only 1 internal link(s); the convention is 3 to 12.

and 2 more from the same run

Radiation dose monitoring: a practical program guide
blg-771315-radiation-dose-monitoring

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 27 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 2 more from the same run

RADPEER scoring: six step QA checklist for radiology teams
blg-775648-radpeer-scoring

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 10 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 2 more from the same run

Double reading radiology: a procurement guide for buyers
blg-779314-double-reading-radiology

No verdict on disk. The file changed after its last check and the verdict is keyed to the file content, so nothing here is known to pass.

warn 9 antithesis constructions ("X, not Y" / "rather than"); budget is 2 per file.

and 1 more from the same run

Unticking Only deliveries that pass the gates would stage all 5 onto Sep 1, Sep 3, Sep 8, Sep 10 and Sep 15 anyway. Apply would then be refused by the same gates and the tray would sit there unlandable, so the box stays ticked by default.

Variant C3

Accent bar

No fill, a 3px primary bar down the left edge and the position in the footer.

What you are looking at

The lightest of the three. A planned card looks like a normal scheduled card wearing a stripe, so a month with five placements still reads as a month rather than a plan.

Position and undo sit in the footer row next to the section chip, so the card keeps the same height as a booked one.

Why it might win

  • Least visual noise across a full month, and the booked articles stay readable.
  • The stripe scales: ten placements do not turn the grid into a blue wall.

The tradeoff

  • It is the least distinguishable from a scheduled card, and the whole point is that these are not scheduled yet.
  • A 3px stripe is easy to miss on a laptop screen at 1280px, where each day column is about 150px wide.
  • Depends on the legend more than the other two do.

Recommended: C2, numbered placement card

The one fact a planned card carries that a pending move never does is its position in a plan of five, and C2 is the only variant that shows it. Solid blue against amber also stays legible across a whole month, which is the state that has to be readable; C3 depends on a 3px stripe and a legend.

Against it: a solid border reads as committed when nothing is. If that bothers you, C1 keeps the dashed "not real yet" edge and the ordinal can be added to it.

After you pick

What happens next

Your picks get built 1:1 inside admin-content-calendar.component.ts, translated to the project's oklch tokens with every pixel value preserved, and verified with Playwright screenshots at 1440x900 against these frames. Auto-schedule invents no write path: it fills the same pending tray a drag fills, and Check and Apply call the same batch endpoint with the same gates behind it.

Nothing is committed until you say so. Every article, date, slug, word count and gate sentence in these frames was read off disk this morning, so what you approve here is what September actually looks like.

Module A -
Module B -
Module C -

Your picks

Copy this and paste it back into the session. Anything you ticked or typed comes with it.